2005-11-10 / About Town

For the record

Due to an editing error, a story in the Nov. 3 Jamestown Press about maintaining and testing private water wells incorrectly said that the new highway barn plans would site the structure on a lot adjacent to the former landfill.

The current plans call for the barn to be located on a section of the landfill itself, with a well serving the barn being drilled on the adjacent lot.

Return to top