|
|||||
|
Town Hall Records Building permits Juliana Wilson received a permit on April 19 to remove and replace windows and doors, remove shed roofs and construct a new entryway at 199 Conanicus Ave., work estimated to cost $7,500. Marjorie Prior received a permit on April 19 to build a singlefamily three- bedroom house with attached garage and demolish existing garage at 40 Columbia Ave., work estimated to cost $224,000. Tom and Linda Brome received a permit on April 27 to replace interior walls and expand a bathroom at 566 Seaside Drive, work estimated to cost $20,000. Tom and Linda Brome received a permit on April 27 to install a retention wall at 566 Seaside Drive, work estimated to cost $10,000. David and Janice Martin received a permit on April 27 to repair a front porch, kitchen, bathroom, new roof shingles, pour concrete floor, and re-plumb and rewire as needed at 23 Clinton Ave., work estimated to cost $25,000. John and Robin Tregenza received a permit on April 27 to build a 10-feet by 10-feet shed at 30 Green Lane, work estimated to cost$2,900. North Meadow Properties LLC received a permit on April 27 to strip and re-roof a car wash building, work estimated to cost $4,000. Donna and Joseph Drago received a permit on April 27 to replace porch railings at 44 Walcott Ave., work estimated to cost $2,700. David and Teresa Edmond received a permit on April 27 to install a shower and remodel an existing bath at 116 Howland Ave., work estimated to cost $3,400. David and Jenella Goodburn received a permit on April 27 to construct a single family modular home at 173 Hamilton Ave., work estimated to cost $200,000. Marc Lennon received a permit on April 27 to install two new windows at 106 Garboard St., work estimated to cost $1,200. Electrical permits Jamestown Waste Water Treatment Facility received a permit on April 18 to finish and install power and control wiring, lighting, gear, generator, equipment, branch circuits and outlets at 1 Freebody Drive, work estimated to cost $400,000. Ann Vieira received a permit on April 27 to revamp main electrical service at 37 Douglas St., work estimated to cost $800. Marjorie Prior received a permit on April 27 to install temporary service at 40 Columbia Ave., work estimated to cost $300. Noreen Farrelly received a permit on April 27 to wire 20 amp outlets in bathroom at 24 Seaside Drive, work estimated to cost $800. Tom Benoit received a permit on April 27 to relocate and install service at 78 Nautilus Rd., work estimated to cost $5,000. Dan Reagan received a permit on April 27 to connect 20 amp split unit service at 180 American Way, work estimated to cost $450. Mechanical permits Kevin Brennan received a permit on April 18 to install an oil fired hot water boiler, 330 gal. oil tank and 60 gal domestic water tank at 7 Clarks Village Rd., work estimated to cost $12,500. Clifford Kurz received a permit on April 18 to install two central air conditioning systems at 56 Wright Lane, work estimated to cost $12,000. Dan Reagan received a permit on April 27 to install mini split A/ C unit at 180 American Way, work estimated to cost $2,500. Onne van der Wal received a permit on April 27 to install twozone hydro air for renovations at 2 Priscilla Rd., work estimated to cost $13,500. Plumbing permits Kevin Brennan received a permit on April 18 to install two full baths, one half bath and laundry at 7 Clarks Village Rd., work estimated to cost $12,000. Tom Benoit received a permit on April 27 to install underground, rough and finish plumbing at 78 Nautilus Road., work estimated to cost $3,400. |
|||||